When Dallas requires a new certificate of occupancy
The City of Dallas quotes its Development Code directly: except for single family and duplex uses, a person shall not use or change the use of a building, a portion of a building, or land without obtaining a certificate of occupancy from the building official.
For a business that is moving, the important word is tenant. The CO belongs to the occupant, not to the building, so the certificate your landlord's last tenant held does not carry over to you.
- First use of land or a building
- A change of use of land or a building
- A change of tenant on an existing CO (the usual case for an office move)
- An existing use that increases or decreases its floor area, for example when you expand into the suite next door or give part of your space back
Sources:City of Dallas: Certificate of Occupancy City of Dallas Building Inspection: When do I need a certificate of occupancy? (brochure)
When a name change is enough
If the only thing changing is the business name on an existing CO (a new DBA), Dallas handles it as a record change rather than a new certificate, and the city's brochure says no inspections are made for it. Changes to an existing CO, such as a new DBA or a revised occupant load, are submitted through DallasNow as a stand-alone CO application that describes the change.
A new address is not a name change. If your business is moving to a different space, you are a new tenant there and need a new CO for that space.
Sources:City of Dallas: Certificate of Occupancy (record changes and FAQ)
How to apply in Dallas
All Dallas certificates of occupancy are applied for through DallasNow, the city's online permitting system. You submit the application and a Land Use Questionnaire with the fee. The city lists the current CO fees on its certificate of occupancy page and fee schedule.
What happens next depends on whether your business is the same kind of use as the last occupant. An office moving into a space that was already an office is usually the simpler path; a different use triggers plan review.
- Same use as the previous occupant: once the application is approved and paid, inspections can be scheduled without delay.
- Different use: the application is routed to the Building Code and Zoning teams, and you may have to upload a site plan, a floor plan of the tenant space and a parking analysis.
- The city's checklist adds extra requirements for some uses, including warehouses and storage (floor plan of storage areas; storage over 12 feet is high-piled and needs engineered plans) and assembly uses such as restaurants of 750 square feet or more.
- A CO does not authorize construction. If the space needs work, or there is no record of a permit creating the tenant space, a building permit may be required first; ask the property owner to contact the city.
Sources:City of Dallas: Certificate of Occupancy application checklist and required documents (PDF) City of Dallas: DallasNow
Inspections, and why the CO controls your power
Dallas inspects the space before it issues the CO. The city's process runs: application received, pre-screen, invoice, payment, approval or routing for review, then inspections, and the CO is released once all inspections pass.
The city's brochure explains why this matters on moving day: before the space can be occupied and electricity turned on by Oncor, the site must be inspected and approved by the building, electrical and plumbing/mechanical inspectors, and once the inspections are approved the city releases the electricity to Oncor. The brochure says to allow 24 to 72 hours for electrical service after that notice. A suite with no power is a suite where nobody can test the network on Monday morning.
- The building must be open to the inspectors on the day of the inspection, with the correct address and suite number posted; if it is not accessible and ready, the city charges a reinspection fee.
- Food service businesses also need a health inspection.
- A temporary CO (TCO) can allow occupancy while non-life-safety items, such as landscaping, are finished. Dallas TCOs are reviewed by the district managers, so contact your district office early if you think you will need one.
Sources:City of Dallas Building Inspection: CO brochure (inspections, Oncor release, TCO) City of Dallas: Certificate of Occupancy (inspection process, TCO)
How long it takes, and how to time it with the move
Dallas does not promise a turnaround: the city says processing times differ based on demand, and that incorrect or insufficient information can delay approval. The city's building inspection brochure puts plan review for a change of use at up to two weeks depending on the project, while a same-use application could be approved and inspections scheduled quickly. Treat those as a floor, not a promise.
The practical rule is to apply as soon as the new lease is signed, and to set the move date only after you know which path your application is on. If the new space needs a building permit or plan review, that work comes first, and the move waits for it.
- Lease signed: apply for the CO in DallasNow the same week.
- Same use: schedule inspections as soon as the application is approved and paid; make sure someone can let the inspectors in.
- Change of use: expect plan review, and have the site plan, floor plan and parking analysis ready before you apply.
- Before booking the movers: confirm with the building and the city when you can occupy, and that the power will be on for IT set-up.
Sources:City of Dallas: Certificate of Occupancy (processing times)
Fort Worth, Arlington and other DFW cities
Every large city in Dallas–Fort Worth requires a certificate of occupancy before a business occupies commercial space, but each runs its own application and inspections. If your new office is outside the City of Dallas, apply with the city where the new office is, not where you are moving from.
- Fort Worth: no building or structure may be used or occupied until the building official issues a CO. A change of tenant or ownership with the same use is applied for online in Accela Citizen Access ("Occupancy Existing Ordinance") or in person; a different type of business needs a Change of Use permit, reviewed by building and zoning. The CO is emailed the business day after final approval.
- Arlington: a building or tenant space may not be occupied, and the business may not be operated, until the CO is issued. A New Tenant CO needs both Building and Fire Department inspections. The city says application review may take about 2 to 3 business days, and inspections can be scheduled for the next business day after approval.
- Prosper: a new or remodeled business space needs a CO, and the town says furniture can be moved in before then only after approval from the assigned building inspector and the Fire Marshal's office.
Sources:City of Fort Worth: Certificate of Occupancy (CO) City of Arlington: Certificate of Occupancy application review and inspection procedures Town of Prosper: FAQ
How Green Van Lines plans an office move around the CO
Green Van Lines is a Dallas–Fort Worth moving company at 4310 McEwen Rd in Farmers Branch, founded in 2007. The certificate of occupancy is yours to apply for, not the mover's, but it sets the date the move can happen. When we walk an office before quoting, we ask where the new space stands with the city and the building, so the move is booked for a date you can actually occupy, with elevator and loading-dock times reserved at both buildings. Questions about an office move: (469) 429-0336.
Sources:Office movers in Dallas
Quick answers
Do you need a certificate of occupancy to move offices in Dallas?
Yes. The Dallas Development Code requires a new certificate of occupancy for a change of tenant on an existing CO, so a business moving into an office needs its own CO even if the previous tenant had one. A new CO is also required for a first use, a change of use, and any change in the floor area of an existing use. Only single family and duplex uses are exempt.
Does the previous tenant's certificate of occupancy transfer to my business?
No. In Dallas a change of tenant on an existing CO requires a new certificate. A record change, with no inspections, is only for a change of the business name (DBA) on an existing CO, not for a new business or a new address.
How do I apply for a certificate of occupancy in Dallas?
Through DallasNow, the city's online permitting system: submit the application and a Land Use Questionnaire with the fee. If your use is the same as the previous occupant's, inspections can be scheduled once the application is approved and paid. If it is different, the application goes to the Building Code and Zoning teams and you may need a site plan, floor plan and parking analysis.
How long does a certificate of occupancy take in Dallas?
The City of Dallas says processing times differ based on demand, and that incomplete or incorrect information delays approval. A same-use application moves fastest; a change of use goes through plan review, which the city's brochure puts at up to two weeks depending on the project. Apply as soon as the lease is signed and set the move date once you know which path you are on.
Can I move furniture into a new office before the certificate of occupancy is issued?
Not without the city's say-so. Arlington, for example, says a space may not be occupied and the business may not operate until the CO is issued, and Prosper allows furniture in before the CO only with approval from the building inspector and the Fire Marshal's office. In Dallas the city releases electricity to Oncor only after the CO inspections pass. Ask the city that issues your CO before scheduling movers into an uncertified space.
Does a family moving into a house need a certificate of occupancy in Dallas?
The Dallas Development Code's CO requirement excludes single family and duplex uses, so a household moving into a house or duplex does not apply for one. Commercial and other non-residential spaces, and multifamily properties, follow the CO rules.